Brunvoll has signed a contract with VARD Group for the delivery of an extensive propulsion and manoeuvring system for Toyo Construction Co. Ltd new Cable Laying Vessel (CLV).
Toyo’s new vessel will have three azimuth propulsion thrusters in the aft of the vessel. The foreship of the vessel will have two tunnel thrusters and a retractable azimuth thruster. Furthermore, the vessel will feature Brunvoll’s control system for propulsion and manoeuvring, BruCon PTC.
The vessel is designed by VARD and will have a length of 150 meter, a beam of 28 meter and cable capacity of 9.000 tons. The hull will be built at VARD’s shipyard in Tulcea in Romania before it gets towed to one of VARD’s shipyards in Norway for further outfitting. The vessel will enter into operation in Q2 2026.
Source: Brunvoll.
Tags: Brunvoll, Cable, Vard, Vessel
Recent Posts
IHI admits improper alteration of data over 4,000 marine engines
Shipowners welcome 40% production benchmark
MPCC opts for 2 methanol dual-fuel ships
WinGD to debut short-stroke engine design
MarineDOT cuts fuel consumption by 100,000 gallons using ABB technology
CMA CGM invests $214m in shipping decarbonisation
SEB adds shipping to 2030 net zero target
MB Shipbrokers and Azolla create decarbonisation solution