bp has opened its first ultra-fast-charging facilities aimed at medium and heavy-duty electric trucks to support the decarbonisation of the sector – where, according to the IEAi, tailpipe CO2 emissions have increased on average 2.2% annually since 2000.
Operated by bp’s Aral brand, the retail site at Schwegenheim in Rheinland-Pfalz, Germany now has two state-of-the-art 300kw ultra-fast chargers intended for electric trucks, powered by 100% renewable energyii. Situated on the major B9 road, the Schwegenheim site provides truck drivers with a convenient, safe, well-lit station where an electric truck capable of charging at 300kw could increase its remaining range by around 150-200km during a driver’s mandatory 45-minute breakiii. And the driver has access to additional services such as food and drink for their journeys, as well as toilets.
Source: bp
Tags: BP, Charging Facilities, CO2 Emissions, Electric Truck
Recent Posts
Zero-carbon ammonia for shipping faces challenges
Wärtsilä signs lifecycle agreement for 7 Capital Gas LNG carriers
ABS releases report on nuclear LNG carrier design
NTPC develops indigenous catalyst for methanol production
Huangpu Wenchong receives AIP from CCS for ships using methanol and ammonia
Climate change will cause India’s GDP to decline by 24.7% by 2070: ADB
Masdar and EMSTEEL complete project using green hydrogen to produce steel
DNV Grants HHI AiP for ammonia DF large container vessel