Vinci awarded contract to design and build LNG terminal in Germany
Vinci, in a consortium with Sener. has signed a contract to build Germany’s first LNG re-gasification terminal. The plant will have a production capacity of 10 billion cu m of natural gas per year and will have two 165,000 cu m storage tanks. The terminal will also be equipped with auxiliary operating systems, infrastructure, and