The Port of Duisburg (Duisport) has teamed up with Lhyfe to look into the feasibility of building the first major electrolysis plant in the port.
The planned factory would have a capacity of up to 20 MW and could be built on a plot of land owned by Duisburger Hafen by mid-2025. If the project is implemented, up to eight tonnes of green hydrogen could be produced every day.
Duisport has signed up to use green hydrogen produced at the site for its internal logistics and the operation of the Duisburg Gateway Terminal (DGT).
In addition, Duisburger Verkehrs- und Versorgungsgesellschaft (DVV) and Wirtschaftsbetriebe Duisburg (WBD) have signed a declaration of intent to use the energy source for their hydrogen buses and hydrogen-powered refuse collection vehicles, respectively.
Tags: Duisport, Eloctrilysis, Lhyfe
Recent Posts
IAC raises the question on India’s absence in LPG autogas vehicles
Montra Electric and Magenta Mobility forge partnership for sustainable logistics solutions
Amogy accelerates commercialization of ammonia cracking catalyst in partnership with JGC
Union Minister Pralhad Joshi visits Greenko’s integrated renewable energy storage project
Government aims at 30% ethanol blending with petrol by 2030
Rio Tinto and AMG Metals & Materials to assess low-carbon aluminium project in India
Gasum selects Wärtsilä for another bioLNG project in Sweden
V. secures full management contract with International Seaways