Adani Green Energy says it has completed 2.14 GW of solar-wind hybrid projects in the Indian state of Rajasthan. The installations collectively use 5.8 million 535 Wp solar modules and 353 wind turbines. Adani Green Energy has commissioned a 2.14 GW solar-wind hybrid cluster in Jaisalmer district, in the Indian state of Rajasthan. The site, spanning 11,500 acres, features 5.8 million solar modules, with capacities of 535 Wp each. About 40% of the total PV capacity includes fixed-tilt module mounting structures. In addition, the projedt includes 353 wind turbines.
Adani Green Energy’s future plans involve the development of a 15 GW hybrid solar-wind project in Khavda, Gujarat. This upcoming cluster will span 70,500 acres. It will feature 33.6 million PV modules, each 570+ Wp in size. The setup will include trackers with robotic cleaning technology and 375 wind turbines. Tags: Adani Green Energy, Hybrid, Renewable
Recent Posts
Govt to introduce hydrogen-based process for steel production
LR to support Shandong Marine Group’s green energy transition
Bureau Veritas assesses technical viability of carbon capture tech
Ricardo gets AiP for marine hydrogen fuel-cell system
K Line successfully conducts B100 trial
Centre extends bid deadline for oil, gas blocks
CoolCo inks long-term charter deal with GAIL
Airbus launches aviation liquid hydrogen project