NTPC Limited has captured its first carbon dioxide (CO2) from flue gas stream of 500 MW coal-based power plant located at Vindhyachal Super Thermal Power Station (VSTPS).
This plant is designed to capture 20 tonnes of CO2 every day. This initiative shall pave the way for scaling up CO2 capture technology and greening the coal power generation. At the same location, NTPC is also setting up green hydrogen generation plant which will use proton exchange membrane electrolysers to produce 2 tonnes per day of hydrogen.
Subsequently, 20 tonnes per day of captured CO2 and 2 tons per day of hydrogen shall be utilised to produce 10 tonnes per day of green methanol through a heterogeneous catalytic process.
The integrated CO2 to methanol project has been conceived, designed, engineered and awarded by the research and development wing of NTPC i.e. NTPC Energy Technology Research Alliance (NETRA) and executed by VSTPS Green Chemical Department in coordination with NETRA.
Tags: CO2, Coal-based, NTPC, VSTPS
Recent Posts
Vedanta Aluminium signs pact with GAIL for supply of natural gas
HMM introduces South Korea’s first LNG-powered vessels
NGEL inks pact with NREDCAP in Andhra for RE projects
Global warming won’t end if net zero is redefined
The Liberian Registry and Korean Register (KR) grant AiP to Samsung
To satisfy decarbonization targets, Big Oil invests billions in the manufacture of biofuel
ISO issues standards for methanol as a marine fuel
Amazon, partners to test electric trucks on a freight corridor in India