Liquid Wind has partnered up with compatriot energy firm Umeå Energi to build Sweden’s third e-methanol plant for shipping fuel. Following a feasibility study, the partners have decided to establish a facility at the Dåva cogeneration plant in Umeå capable of producing 100,000 tons of green e-methanol per year and capturing 230,000 tons of carbon dioxide annually.
The Dåva facility will follow Örnsköldsvik and Sundsvall e-methanol projects already being developed in Västernorrland. The Ørsted-controlled facility in Örnsköldsvik is set to become Europe’s largest e-methanol plant with 50,000 tonnes of shipping fuel produced yearly from 2025. Liquid Wind said that all documents required for an investment decision are planned to be ready in 2024, with an expected production start in 2026.
Tags: Liquid Wind, Methanol, Sweden, Umeå Energi
Recent Posts
India’s second green hydrogen auction awards $258m to 9 companies
Indian OMCs launch new biodiesel tender for FY 2025-26
India’s first hydrogen train set for launch by March 31
India approves legislation to boost oil and gas exploration
HIF Global leads the way with first US e-Fuels route clearance
Baltic Exchange introduces biofuel blends in latest expansion of its emissions calculator
COSCO SHIPPING sets new record for biofuel bunkering
Magenta mobility introduces NorMincv IoT vehicle management platform