Fulcrum BioEnergy commissioned the world’s first landfill waste-to-syngas phase and initial operations have started at Sierra biofuels plant. The facility is processing prepared waste feedstock and producing hydrocarbon synthetic gas, or syngas, ready for conventional Fischer-Tropsch fuel production that will take place on site.
The plant, which is located outside of Reno, Nevada, includes both a feedstock processing facility and a biorefinery with the capacity to convert approximately 175,000 tons of prepared landfill waste into approximately 11 million gallons of renewable syncrude annually, which will then be upgraded to renewable transportation fuel.
Tags: Biofuels, Feedstock, Fulcrum BioEnergy, Syngas, Synthetic Gas
Recent Posts
Adani launches India’s first hydrogen-powered truck
MAN Energy Solutions Completes Type Approval Test for Upgraded Dual-Fuel GenSet
Global Shipyards Launch Alliance to Accelerate Maritime Sustainability
Port of Antwerp-Bruges Launches Volta 1, Europe’s First Fully Electric Tugboat
CMA CGM Adds Second Methanol-Powered Vessel ‘Argon’ to Its Fleet
Electric Orkney Project Launches Game-Changing Hydrofoil Vessel ‘Zevi 1’
Zeppelin Power Systems Unveils Hydrogen-Powered Fuel Cell Generator in Hamburg
FueLNG Completes 400th LNG Ship-to-Ship Bunkering Operation in Singapore