Engineering firm GTT said it was chosen by Korean shipyard HJ Shipbuilding & Construction to design the cryogenic fuel tanks of two new liquefied natural gas (LNG) fuelled container vessels. The contract was awarded on behalf of a European ship-owner.
These vessels, each capable of carrying 7,700 containers, will be equipped with an LNG fuel tank with a capacity of 6,100m3. Each LNG fuel tank will be fitted with the Mark III membrane containment technology. Deliveries of the vessels are scheduled for the fourth quarter of 2024.
Tags: Container Vessel, GTT, Korean Shipyard, LNG
Recent Posts
Govt to introduce hydrogen-based process for steel production
LR to support Shandong Marine Group’s green energy transition
Bureau Veritas assesses technical viability of carbon capture tech
Ricardo gets AiP for marine hydrogen fuel-cell system
K Line successfully conducts B100 trial
Centre extends bid deadline for oil, gas blocks
CoolCo inks long-term charter deal with GAIL
Airbus launches aviation liquid hydrogen project