New Fortress Energy (NFE) will use a series of technologies from technology company Honeywell UOP to remove various contaminants from natural gas prior to liquefaction at its fast LNG (liquefied natural gas) projects.
According to Honeywell, it will provide engineering services and process technology which will pretreat feed gas at NFE’s facilities. To note, NFE’s every project is a nominal 1.4 million tonnes per annum LNG gas treating and liquefaction plant.
Honeywell’s technologies are optimised for onshore and offshore natural gas conditioning, treating, natural gas liquids recovery, LNG pretreatment, and synthesis gas purification from a single unit to highly integrated, multiple technology operations, and the technology company claims its solutions for contaminant removal and hydrocarbon management are used in the production of about 40% of the world’s LNG.
Honeywell recently committed to achieving carbon neutrality in its operations and facilities by 2035.
In September NFE selected Norwegian maritime engineering company ECONNECT Energy to provide its LNG transfer technology to its fast LNG projects.
Tags: Honeywell, LNG, Natural Gas, NFE
Recent Posts
Govt to introduce hydrogen-based process for steel production
LR to support Shandong Marine Group’s green energy transition
Bureau Veritas assesses technical viability of carbon capture tech
Ricardo gets AiP for marine hydrogen fuel-cell system
K Line successfully conducts B100 trial
Centre extends bid deadline for oil, gas blocks
CoolCo inks long-term charter deal with GAIL
Airbus launches aviation liquid hydrogen project