Wärtsilä has received its first order for carbon capture and storage (CSS)-ready scrubbers for delivery in 2023.
The 35 MW units will be fitted on four 8,200 teu boxships under construction at an Asian shipyard in an open loop configuration.
Wärtsilä said it will perform additional design and engineering work to ensure that future retrofits for a full CCS system on the vessels have already been accounted for during the newbuilding construction stage.
The company is currently testing its CCS system at 70% capture rate and a pilot installation will take place within the next twelve months. The shipowner behind the order was undisclosed, but Wärtsilä said that CCS-ready solution would allow it for continued regulatory compliance for SOx emissions and enable smooth CCS system adoption in the future.
Tags: Boxship, CCS, Scrubbers, Wartsila
Recent Posts
Yara, AM Green sign term sheet for sale of ammonia
Transition to zero-emission fuels could generate massive new jobs
Idemitsu invests in HIF to develop a supply chain of e-methanol
Fortescue’s Green Pioneer wins hydrogen transport award in Rotterdam
UMAS report says UK well-positioned to start transition to green fuels
Trafigura to acquire Greenergy’s Canadian operations
Record breaking increase of carbon dioxide in March
China develops first vehicle-mounted liquid hydrogen system