Renewable energy solutions provider Suzlon has bagged an order to develop 69.3 MW wind power project from Juniper Green Energy.
The project is located at Surendra Nagar district in Gujarat and is expected to be commissioned in 2024.
Suzlon will install 22 wind turbine generators (WTGs) with a Hybrid Lattice Tubular (HLT) tower of their new product with a rated capacity of 3.15 MW each.
This is the first major order for the company’s largest turbine rated 3.15 MW, S144-140m from the 3 MW series.
As part of the agreement, Suzlon will supply the wind turbines (equipment supply) and execute the project including, erection and commissioning.
Suzlon will also provide comprehensive operations and maintenance services post-commissioning.
Tags: HLT, Juniper Green Energy, Suzlon, Wind Power
Recent Posts
FueLNG Completes 400th LNG Ship-to-Ship Bunkering Operation in Singapore
Port of Gothenburg Hosts First Bunkering of Swedish-Produced Biomethane for Maritime Sector
UrbanLink Expands REGENT Seaglider Order, Driving Forward Zero-Emission Coastal Travel in Florida and Puerto Rico
HD Hyundai Executive Vice Chairman Holds Landmark Talks with U.S. Trade Representative on Shipbuilding Cooperation
ZeroNorth and Veracity by DNV launch end-to-end emissions reporting and verification service for the maritime industry
Hapag-Lloyd Expands ‘Hamburg Express’ Class Fleet with Delivery of Genova Express
Bureau Veritas calls for standardized safety regulations to accelerate adoption of electrification technology
ABS Publishes Safety Insights for Ammonia as a Marine Fuel