Engineering services company Worley has secured a contract to support Green Lithium’s plans to build the UK’s first large-scale merchant lithium refinery in Teeside.
Worley has announced that it has commenced work on the first lithium refinery in the UK, which will be built in Teesside by Green Lithium. Once operational, the plant is expected to produce 50,000 tonnes of battery-grade lithium a year.
Lithium is an essential material in battery manufacturing. However, Europe’s current lithium-refining capacity in Europe doesn’t match the increasing demand for battery-grade lithium chemicals. According to the company, the Teesside plant will produce up to 6 per cent of Europe’s expected battery demand by 2030, providing enough of the material to produce one million EVs annually.
The new refinery is designed to supply low-carbon, battery-grade lithium chemicals to serve the growing European market for energy storage systems and electric vehicles (EVs) and in the process facilitate decarbonisation objectives, green jobs and long-term economic prosperity.
Worley said it will provide engineering services for front-end loading of various supporting components for the plant’s technology system. This will involve developing the balance of engineering, supporting critical planning and permitting activities, general construction aspects and developing philosophy documents for control systems and automation.
At the moment, there are no other lithium-refining plants in Europe, although a total of 35 lithium-ion production projects had been announced on the continent as of March 2022. Some of these include CATL’s in Germany; a second facility in Hungary from SK Innovation, and plants in Germany and France from Automotive Cells Company, a new company backed by Saft, Stellantis and Mercedes.
However, according to a plan put together by the European Chemicals Agency, lithium could be subjected to stricter regulation, based on studies that suggest a link between exposure and development problems, as well as reduced fertility.
In July this year, a huge fire in a London high-rise prompted firefighters to issue an urgent warning about the risk of fires involving the batteries of converted e-bikes.
The Teeside refinery is expected to be fully operational by 2025.
Tags: Green Lithium, Lithium, Refinery, Teesside, Worley
Recent Posts
Seafarer Wellbeing Highlighted in New Decarbonisation Guidance from ISWAN
India Outlines Green Hydrogen Strategy at World Hydrogen Summit 2025 in Rotterdam
Port of Rotterdam and EDGE Navigation Partner to Advance Liquid Hydrogen Infrastructure
Finnlines Launches Low-Carbon “Green Lane” Sea Transport Service with Up to 90% Emission Cuts
Microsoft Teams Up with NORDEN to Cut Maritime Supply Chain Emissions
Höegh Autoliners’ Fifth Aurora-Class PCTC Enters Service with Multi-Fuel Capability
Next-Gen Marine Propulsion: MAN Launches Methanol Super Engine
Port of Amsterdam Marks First Ship-to-Ship Methanol Bunkering