NTPC and Siemens Ltd signed a Memorandum of Understanding (MoU) for feasibility to demonstrate hydrogen co-firing blended with natural gas in Siemens V94.2 gas turbines installed at NTPC Faridabad gas power plant.
Under this significant collaboration, the two companies will jointly explore the pathways to reduce CO2 emissions from Faridabad gas power plant and further implementation at scale across NTPC’s installed units in India, the company said.
NTPC said that the total installed capacity of Faridabad gas power plant is 432 megawatt (MW) with two V94.2 gas turbines operating in combined cycle mode.
As a part of this initiative, NTPC is exploring various new hydrogen generation technologies along with hydrogen usage so as to ensure future readiness, develop the required capabilities, technical expertise, align with the national decarbonizing and hydrogen mission targets.
Under this MoU, both the companies will collaborate to study the feasibility of introducing hydrogen co-firing in Faridabad gas power plant. Based on the feasibility studies, a pilot project for 5% (by volume) hydrogen co-firing may be implemented for demonstrating the capability and the hydrogen required for the project shall be arranged by NTPC.
Tags: Hydrogen, NTPC, Siemens
Recent Posts
SRK achieves net zero certification in global diamond sector
Banle Energy takes part in Tata Steel B24 bio bunker fuel voyage
NS United orders methanol newbuild
BG Freight Line launches biomethanol feeders to service
Hutchison Ports BEST leads the way in environmental sustainability
Yara, AM Green sign term sheet for sale of ammonia
Transition to zero-emission fuels could generate massive new jobs
Idemitsu invests in HIF to develop a supply chain of e-methanol